Exterior Thermal Envelope Repair
Project Details: The goal of this project was to eliminate the condensation issues our client was having on the inside of their cooler warehouse. To do this we had to remove the exterior metal sheeting as well as the wet fiberglass batt insulation. To create a new thermal envelope we applied foam-in-place urethane insulation (to replace the batt insulation and create an airtight seal) as well as installed new 4" insulated wall panels to the exterior of the cooler to ensure an air/water tight seal.
Insulated Panel Suspended Ceiling - Production Area
Project Details: The scope of this project was to install a USDA food safe insulated panel suspended ceiling above an existing production environment in a 50 year old facility. We overcame a magnitude of challenges including: working around an existing network of pipes and confined working conditions to name a few. This project was a huge success both for our organization as well as our client, as they no longer stress about the condition of their facility come audit season.
Blast Freezer - Demolition and Reassemble
Project Details: The goal of this project was to remove an old Cam-Lock blast freezer, which had an excessive amount of energy loss and issues with condensation. We dissembled the old Cam-Lock freezer panels and replaced them with Stainless Steel/White Metl-span cold storage panels. We were able to complete this project without the removal of existing electrical conduit and ammonia lines, thus expediting the project schedule and minimizing the cost of the project. To ensure an air/water tight seal, we custom fabricated each of the four corners as well as caulk sealed the interior and exterior panel surfaces